step through kits Back   Next

Burrell Astbury Steam - Burrell - The Build - Kit 1

 

Signed up with ModelWorks at the recent Model Engineer Exhibition at Sandown. By agreement the first 3 kits arrived together mid January 2004.

Kit 01 is the two front wheels. Have been cleaning up the spokes with a flap wheel and starting to assemble. No problems so far.

Preparations ...

Kit 01 - as it arrives Flap wheel mounted in the pillar drill

 

Fitting the spokes ...

Kit 01 - Front wheel assembly - first 5 spokes Kit 01 - Front wheel assembly - next set of spokes Kit 01 - Front wheel assembly - all spokes in

 

Almost complete ...

Kit 01 - Front wheel assembly - outer side Kit 01 - Front wheel assembly - inner side

At this stage the components have been glued into place with the Araldite supplied, a standard two part epoxy adhesive. When cleaning this up the solvent Acetone proved useful, should be available from your local chemist although you may need to pre-order.

 


Go back to Back the Astbury Burrell page

Last revised 25 February 2004.
This document is copyright © 2004 by Duncan Astbury & Cherry Loughridge. All rights reserved.